Vanadium pentoxide (V2O5) production was 2,906 tonnes, compared with 3,260 tonnes produced in Q3 2021. Lower quarterly production was due to a planned kiln and cooler refractory refurbishment and a change of mining contractor, but was in line with the company’s revised production guidance.
V2O5 equivalent sales recorded 2,796 tonnes (inclusive of 351 tonnes of purchased material), higher than 2,685 tonnes sold in Q3 2021.