The consortium formed by battery manufacturer Prime Batteries Technology and the engineering and technical consulting firm Enevo Group, both of them Romanian, won a RON 80 million (VAT excluded) contract to build a power storage facility at Hidroelectrica’s (BVB: H2O) wind farm Crucea, Hidroelectrica announced in a note to investors. The facility should be commissioned within 12 months.
For more information, please visit: https://www.ferroalloynet.com/news/romanias_prime_batteries_to_build_72_mwh_power_storage_facility_for_hidroelectrica.html