On March 28, Beijing Green V Energy’s 1MW/2MWh vanadium redox flow battery (VRFB) system was officially shipped.
From the packaging of the core battery stack to the system integration test, every link has undergone strict quality control. The Vstorage-MW system loaded this time is equipped with a 100kW ultra-high power battery stack.
For more information, please visit: https://www.ferroalloynet.com/news/beijing_green_v_energys_1mw2mwh_vrfb_system_equipped_with_a_100kw_ultrahigh_stack_was_officially_on_.html